Hurlcon Gas Fired Hot Water Boiler H120 & H150 S & B Models INSTALLATION AND OPERATING INSTRUCTIONS HURLCON Manufacturing & S
H120 –H150 Hot Water Boilers page 10 3.8 HEATING PIPE SIZE & LAYOUT • The flow & return connection sizes of 1”BSP on the boiler are no
H120 –H150 Hot Water Boilers page 11 4.0 COMMISSIONING 4.1 STARTING BOILER • Fill system with water and purge all air from system and pump. •
H120 –H150 Hot Water Boilers page 12 4.4 GENUS IV 3 BUTTON CONTROLLER • 90° or 55° operation. H series boilers are set factory default 90°. Fo
H120 –H150 Hot Water Boilers page 13 5.1 ENERGY SAVING TIPS • During extended periods of non use, turn the boiler off. • Set up a regular progr
H120 –H150 Hot Water Boilers page 14 • To prevent rapid cycling of the boiler, the thermostat has an inbuilt time delay which prevents the boiler
H120 –H150 Hot Water Boilers page 15 5.3.4 OPERATION Sequence of events once the boiler has been correctly installed with the room thermostat an
H120 –H150 Hot Water Boilers page 16 6.2 GAS – COMPONENT INFORMATION Natural Gas Propane Gas ULPG Gas Injector Burner Injector Bur
H120 –H150 Hot Water Boilers page 17 7.0 TROUBLESHOOTING BOILER WILL NOT LIGHT Possible cause Remedy Automatic ignition system fails Check wa
H120 –H150 Hot Water Boilers page 18 8.0 H120 – H150 WIRING DIAGRAM 8.1 MODEL H120 – H150 WITH HEATSAVER 8.2 55 – 90 DEGREE SETTING & THERM
H120 –H150 Hot Water Boilers page 19 9.0 ONE YEAR LIMITED WARRANTY GENERAL CONDITIONS Hurlcon cover your boiler with a limited 1 year
H120 –H150 Hot Water Boilers page 2 INSTALLATION AND OPERATING INSTRUCTIONS ...1 1.0 INT
H120 –H150 Hot Water Boilers page 3 1.0 INTRODUCTION Congratulations on your purchase of a Hurlcon H120 - H150 Series Hot Water Boiler. Correct
H120 –H150 Hot Water Boilers page 4 2.0 MODELS AVAILABLE Details Model 120S & 120B Model 150S & 150B Height 900 900 Length 510
H120 –H150 Hot Water Boilers page 5 3.0 INSTALLATION THIS APPLIANCE MUST BE INSTALLED BY AN AUTHORISED PERSON. Refer to boiler data plate for s
H120 –H150 Hot Water Boilers page 6 3.2 GUIDE TO INSTALLATION Location of Flue Terminals – An extract from AG 601 Minimum Clearances Required Fo
H120 –H150 Hot Water Boilers page 7 3.3 CLEARANCES The boiler must be installed at least 500mm from any combustible surface. Clearances must com
H120 –H150 Hot Water Boilers page 8 3.5 BOILER DIMENSIONS 3.6 INDOOR INSTALLATION If the H120 - 150 Boiler is to
H120 –H150 Hot Water Boilers page 9 3.7 VENTILATION – AIR SUPPLY TO THE BOILER When installing the boiler indoors, it is imperative that an ade
Comments to this Manuals